r@m
Active Member
Working on the tunnel leading from Place Du Carousel to the junction of Ru De Rivoli & Ru De Rohan.
The gap is 3.29m across, apparently he took this at 65mph..I may make it slightly narrower
.
The traffic light was placed on the left in the original.
These are just block-outs, proportion and detail need tweaking.
The gap is 3.29m across, apparently he took this at 65mph..I may make it slightly narrower
The traffic light was placed on the left in the original.
These are just block-outs, proportion and detail need tweaking.
Attachments
-
1.1 MB Views: 465
Last edited: